Building demolition support

Building demolition support

Expected profit: precise quantities before demolition is started, continuous documentation during demolition
Expected cost: 0% if the OrthoGraph BIM model is available during building operation, 0.1% of the original investment cost if a new survey is required
Products used: OrthoGraph, Leica BLK360, one external CAFM software

Our systems also collaborate in the final phase of the lifecycle of buildings, in their demolition. The available or newly surveyed OrthoGraph BIM models give clear and precise quantities for the amounts of waste created, at a high level of precision, greater than 99%. It is even possible to give precise quantities in the case of properties that are difficult to access due to the BIM models created through the fast surveying processes, and as a result of the Leica BLK360 laser scanner the statuses before demolition and the demolition phases can be precisely documented as well.

The CAFM systems’ maintenance system can be used for scheduling and issuing demolition work rand for monitoring the processes as wells. By using the systems in a unified way precise demolition planning and documentation can also be realised.

Learn more about OrthoGraph in the construction phase, request a live demo.