Surveying and registering the built-in equipment

Expected profit: as much as 100-300% of the investment cost on guarantee maintenance and in numerous other ways in the course of the operation of the building

Expected cost: 0.025%

Products used: OrthoGraph Enterprise

All built in devices, building engineering elements and all equipment that may possibly be covered at a later stage, such as by false floors and ceilings, can be registered during construction. When equipment is recorded this does not only mean that dimensions and position are recorded, it includes other parameters too, such as serial number, guarantee period, capacity, type number and even a photograph of it.
This information is automatically available in the ArchiFM system, already at the moment of occupation.
These same elements included in the building model can be linked to any other system, such as a building automation system.