Later on construction surveys can prevent many problems and expenses

Expected profit: a reduction of 0.5-1% of the annual operation cost over the course of the entire lifecycle of the building (accumulating to as much as 15-30% of the investment cost in the entire lifecycle)

Expected cost: 0% in the case of surveys performed during the development stage

Products used: Leica BLK360

It should be noted that as a consequence of the detailed documentation any reconstruction or repair work taking place in a later operation phase can be supported with the Leica BLK360 system with the ability to perform any subsequent measurement on the intelligent panorama photos made during the construction phase. In this way plumbing connections and electrical fittings can be located and accessed with minimum wall demolition. In the same way, damage can be prevented with them in the case of damage caused when the under-floor heating systems are drilled through when installing a simple door frame, for example, in other words the safe work-positions are located using precise measurements made in the point cloud before any work in covered areas is carried out.